Hebei, China
Business Type:
Trading Company
Main Products:
Number of Employees:
6
Year of Establishment:
2009-04-07
Management System Certification:
ISO 9001
Average Lead Time:
Peak season lead time: within 15 workday
Off season lead time: within 15 workday
OEM/ODM Service
Sample Available

Tee, Y Tee, Pipe Fitting manufacturer / supplier in China, offering B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee, Carbon Steel Pipe Fittings Cap, Carbon Steel Seamless A234 Wpb Tee for Oil/Gas and so on.

Gold Member Since 2017
Audited Supplier

B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee

Get Latest Price
Min. Order / Reference FOB Price
10 Pieces US $2-1,000/ Piece
Port: Tianjin, China
Production Capacity: 500000PCS/Month
Payment Terms: L/C, T/T, Western Union
Type: Equal
Connection: Welding
Material: Alloy
Shape: Equal Tee
Lateral: 90°Tee
Head Code: Round

You Might Also Like

Loading...

Basic Info

Model NO.: 24"
Wall Thickness: SCH40
Finish: Color Paint
Technics: Forged
Pressure Rating: 3000LBS
Standard: ANSI
Certification: ISO, API, CE
End: Be, PE
Trademark: BEIHAI
Transport Package: Wooden Box/Pallet
Specification: 1m*1m*1m
Origin: Origin
HS Code: 73079300

Product Description

b16.9 alloy steel a234 wp9 45deg lateral tee
Detailed Information as per the following Form

 
TypeTee
SizeSeamless Tee:1/2"~24" DN15~DN600
Welded Tee: 1/2"~100" DN15~DN2500
Wall thicknesssch10, sch20, sch30, std, sch40, sch60, xs, sch80, sch100, 
sch120, sch140, sch160, xxs, std,sch5s, sch20s, sch40s, sch80s
StandardsANSI, ASTM,DIN, JIS, BS, ISO, GB, SH, AND HG etc        
MaterialCarbon steel: ASTM A234 WPB,WPC,ASTM A105
Alloy steel: ASTM A234 WP1-WP12-WP11-WP22-WP5-WP91-WP911 
Stainless steel: ASTM A403 WP 304-304L  ASTM A403 WP 316-316L
ASTM/ASME A403 WP 321-321
Low-temperature steel: ASTM/ASME A402 WPL 3-WPL 6
High performance: ASTM/ASME A860 WPHY 42- 46- 52- 60- 65- 70
Surface treatmentTransparent oil, rust-proof black oil or hot galvanized
Packingwooden case, pallet or as customers' requirement
ApplicationsPetroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc
Min order1 piece
Delivery time7days after receipt of advance payment
CertificationAPI,  ISO9001:2000
Delivery TermFOB(30% down payment in advance, the balance before shipment)
CIF or C&F(30% in advance , the balance against with the copy of B/L)


OTHER PRODUCTS:
B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee


B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee
B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee

PIPE FITTING PRODUCTION PROCESS:

B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee

PIPE FITTING PACKING:
B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee


PIPE FITTING DELIVERY:
B16.9 Alloy Steel A234 Wp9 45deg Lateral Tee



RAQ:
1. Can you offer sample free?
Yes,we can offer free sample.
2. Can you offer Cerificate of Origin?
YES,we can offer
3. Can you accept SGS,BV & LV inspection?
YES,we can accept any Third Party Inspection.
4. Can you offer the Quality Guarantee Certificate?
YES, we can offer 12month long quality guarantee.


 
 

Send your message to this supplier

*From:
*To:
avatar Miss Jancy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now